Geotechnical investigation by drilling/ sampling in four Uncontrolled Waste Tips, in the metropolitan area of Baku and conducting their remediation studies. Included the rehabilitation and vertical expansion by 35 meters of Balakhani landfill, using dynamic compaction of waste, geosynthetics, diaphragm wall, etc.
Client: MINISTRY OF ECONOMIC DEVELOPMENT-INTEGRATED SOLID WASTE MANAGEMENT, HPC- PASECO